FIG PUBLICATION NO. 51

Hanoi Declaration
Land Acquisition in Emerging Economies

Kauko Viitanen
Dang Hung Vo
Frances Plimmer
Jude Wallace

   


This publication as a .pdf-file (28 pages - 1,115 MB)

Contents

Foreword

Hanoi Declaration on Land Acquisition in Emerging Economies

1. Introduction

2. Problems in land acquisition
Market acquisition systems
Human rights based acquisition models
Problems in implementation in practice
Resilience

3. Tools in land acquisition
Direct tools
Compulsory Land Acquisition
Land Readjustment
Indirect tools

4. Building Capacity in Land Acquisition
Land delivery theory
Land delivery processes are cross-cutting
Land parcellation
Building land delivery competencies
Land information system – government level initiative
Anti eviction strategies – grass roots empowerment
Management of hard cases of land grabbing – an initiative for developers

5. The way forward

References and Bibliography

Orders for printed copies


Foreword

The 7th FIG Regional Conference 19–22 October 2009, held in Hanoi, Vietnam focused on Spatial Data Serving People: Land Governance and the Environment – Building the Capacity. This theme was chosen to address some of the key professional issues in East Asia and especially in the host country of Vietnam. The conference recognized that these regions require urgent action especially in terms of reinforcing methods for land acquisition in fast growing urban areas in developing economies.

This document deals with a number of issues: understanding the key problems in land acquisition in a way which ensures effective and efficient outcomes, including appropriate levels of compensation payments; explanation of land tools available for the land acquisition; identification of paths to the competencies needed to support processes of land acquisition; and building institutional and professional capacity for managing land acquisition processes.

The publication should be seen as an a tool to support politicians, executive managers, decision makers and professional organisations in their efforts to deal with land acquisition in a fair way, based on legal standards, full compensation, and acknowledgement of human rights. Land acquisition should secure that adequate development opportunities are available while land rights and social sustainability are fully protected throughout the process.

The document is based on the presentations at the 7th FIG Regional Conference, 19–22 October 2009, Hanoi, Vietnam, especially the keynote presentations. Conference proceedings are available on-line at www.fig.net/pub/vietnam.

An expert group was appointed to prepare the document led by Prof. Kauko Viitanen, Chair of FIG Commission 9, and including Dr. Dang Hung Vo , President of Viet Nam Association of Geodesy, Cartography and Remote Sensing (VGCR), Prof. Frances Plimmer, Chair Elect of FIG Commission 9, and Mrs. Jude Wallace, lawyer and senior consultant on legal land issues.

On behalf of FIG I would like to thank the members of the expert group and all the specialists who contributed to this publication for their constructive and helpful work.

Stig Enemark
FIG President
 


Ha Long Bay, Vietnam


Hanoi Declaration on Land Acquisition in Emerging Economies

The International Federation of Surveyors (FIG) acknowledges land acquisition is a complex area that can be practiced in many ways. Basically, land administration systems must be able to manage the delivery of land for essential developments, private sector development and changes of land uses in response to evolving social and economic demands.

Land acquisition may be carried out through voluntary agreements or through compulsory means (such compulsory purchase) to secure land delivery for development. In these processes good governance is fundamental to achieve the benefits of the protection of formal property rights and informal land uses. The declaration therefore recommends that a number of aims are taken into account:

  • Provide consistent, transparent and efficient legislation and procedures for acquisition through both voluntary and compulsory means and at low transaction costs.
  • Provide clear and transparent rules for inclusion of the parties involved and for determination of adequate compensation which ensures that those displaced are able to re-establish their lives and livelihoods in a proper manner.
  • Ensure that good governance principles are applied for conducting the processes of land acquisition whether they are based on compulsory means or voluntary agreements. Processes must be efficient, fair and legitimate.
  • Ensure that all rights are addressed including informal rights and human rights especially the rights of the poor and vulnerable.

These issues are all addressed in some details in this document.

Land acquisition is a global and complex problem area. The land professional has a range of appropriate professional and technical skills and experience, and therefore is well placed to assist with many of the decisions and support activities. The land professional has the expertise to facilitate interaction and debate among a diversity of professional, political, economic, environmental, and community organisations, and to help jurisdictions achieve appropriate and sustainable solutions.

FIG believes that land professionals, such as surveyors, have key roles to play in supporting the setting of strategies and policies; and facilitating interactions of professionals, politicians and local communities to secure legal and equitable processes of land acquisition, thus improving sustainable management of urban and rural areas in developing economies.

Prof. Stig Enemark
FIG President


1. Introduction

Land is a unique and finite resource, essential for all human activities. The global population is increasing and more and more people are moving to urban areas. More land is needed for housing, employment, infrastructure and services within increasingly small geographical areas. The reduction of carbon emissions and pollution require urgent and effective solutions e.g. in reducing energy consumption. Sustainability is a key word. To reach that goal the actions have to be flexible and resilient.

Management of spatial change and implementation of essential physical structures require land to be put to appropriate uses. Both the public and the private sectors have to be able acquire land and/or change its present use. The public sector normally has insufficient resources to carry out all necessary activities. The private sector may need to provide additional initiatives and risk bearing capacities. However, private sector investment requires capacity and procedures to achieve the desired outcomes, including a profit margin that should be established through legislation. A key strategy for the public is to provide local infrastructure and relevant public services, particularly health and educational facilities, and to encourage individuals and private companies to locate themselves in areas that accord with the land use plans that reflect the wider and evolving needs of society.

Countries and regions use a variety of approaches to implement their adopted land use policies. A country may rely on a predominantly public sector approach or one led by the private sector. In each case, a number of mechanisms are available to ensure that plans and policies will be implemented. However, in each case there are risks that human rights will not be appropriately protected. For example, if the existing legal and procedural requirements do not adequately reflect modern expectations of fairness and equity, outcomes, legal frameworks and established processes are likely to have adverse impact on human rights. Moreover, bureaucracy, ineffective processes, corruption, and lack of resources and capacities undermine sustainable results. In worst cases, essential development will not be achieved.

Fast developing regions typically experience extensive and complex problems that need holistic solutions. The ability of communities to resist the adverse effects of population increase and climate change and to adapt to new demands depends on the capability those communities to change and manage their legal, policy, planning and development environments.


Hanoi, Vietnam.

Land Acquisition Tools

Key means of land acquisition include:

  • Land acquisition by agreement, where public authorities such as the municipality acquire land through private agreement with the landowners to achieve their development objectives. Land acquisition by agreement (or by buying a development option) is also used by professional developers.
  • Land readjustment, which aims to repurpose the physical allocation of land into modern social and business uses e.g. through schemes for urban renewal and down town developments. Land readjustment, or land consolidation, may also be used for adjusting the structure of agricultural or residential holdings to implement major infrastructure projects or nature management plans.
  • Expropriation or compulsory purchase, a well-known means used in most countries that enables any tier of government to purchase land in the public interest against full compensation of the market value. Public interest may be for public roads, parks, and service facilities such as schools and health care. Public interest may, however, also be considered the reason to implement an adopted detailed plan.

Other means of supporting land delivery and land development include:

  • Land banking, where municipalities in particular build up large areas of publicly owned land and thereby control the supply of land for development in certain areas. These strategic purchases place the municipality in a key position for controlling future development through phased disposal of serviced land.
  • Pre-emption rights, which require, in principle, that landowners offer their property for sale to the municipality first and normally at market value. This means can be used in different forms to ensure that the public interests in a certain area can be achieved.
  • Financial incentives, which may include subsidies to encourage specific development at a certain time and place. Incentives could lower land prices, provide property tax abatement over a number of years, or lower the cost of development loans.

A range of other means can also be considered, such as public−private partnerships that are potentially very useful for implementing larger development and regeneration schemes.

Source: Williamson, Enemark, Wallace and Rajabifard (2010)


2. Problems in land acquisition

Land administration theory identifies a series of tools for land delivery consistent with good governance. Standard tools that deliver land for private and public purposes fall into two broad categories: market acquisition systems and human rights based acquisition models. In addition there are practical, often political-related problems.

Market acquisition systems

In developing countries use of formal land markets as a land delivery mechanism fails to meet the tests of capacity. Four common problems are well documented:

  1. The ability to define a level of “compensation” is often problematic. The most common cause of price tension is that the law requires the valuation for land on acquisition to be based on pre-acquisition land uses, often agricultural or slum housing values, and not on the basis of post development use, which may be lucrative, such as industrial and residential estates. Original owners and occupiers who were dispossessed often regard the acceleration of land values as undeserved “windfalls” for the developers. Certainly, if the compensation received is not sufficient to allow the original owners to buy similar replacement accommodation in the same area, they are likely to feel that they have not received adequate payment and to be aggrieved;
  2. In certain jurisdictions, a secondary problem with pricing is reliance on government set values, rather than transparent values set by land trading in an open market recorded in formal systems.
  3. The property base essential for a functioning market system is usually inadequate: land rights claimed by owners and occupants may be unregistered or even undocumented. The targeted land is often held in insecure arrangements, social tenures (Wallace 2009) and informal or customary systems. Price mechanisms in these cases remain flawed as a basis on which to fix compensation, even with willing sellers.
  4. Lack of participation and cooperation among the occupiers and owners in their removal from their businesses and homes makes the trauma of physical dispossession (whether forced or not) their most indelible memory of the process. This lack of participation may be the result of inadequate and ineffective communication, as well as confusion and uncertainty surrounding the payment of compensation.
Human rights based acquisition models

The human rights model of compulsory land acquisition is still under construction. In broad terms the model seeks to resolve the problems that arise in countries with predominantly informal land markets which seek to use market based solutions to fix compensation. The model adds additional components to land delivery processes designed to empower land occupiers and owners. In broad terms, these components demand land takers to:

  1. Acknowledge the entitlements of all displaced persons, including persons with formal legal rights, persons whose claims to land are potentially recognizable under national law, and persons who have neither formal legal rights or land claims recognized or recognizable under law, such as squatters and encroachers.
  2. Ensure that all displaced persons are eligible for resettlement assistance and compensation for loss of both non-land and land assets and rights, including those without legal titles to land or any recognizable legal rights to land.
  3. Calculate the rate of compensation at full replacement cost.
  4. Provide relocation assistance for physically displaced persons, including a livelihood assistance or income rehabilitation program for economically displaced persons at full replacement cost.
  5. Provide effective and efficient information, socialization and consultation processes with affected persons and other related parties about the project and its impact on communities in the early project preparation stage and at other crucial stages.

Most of the large international institutions apply some or all of these standards for land acquisition or compulsory purchase designed to both respect the rights of existing land users and owners and to deliver secure tenure to developers, especially for public projects and projects funded by development aid. However, this is by no means the case for all acquisitions.

Problems in implementation in practice

A common critical issue is that the legislation for land acquisition focuses more on arranging for the delivery of land for development rather than on achieving the necessary provisions for the social sustainability of affected people and communities. For example, compulsory land acquisition measures can be applied in commercial investment projects with the full involvement of the administrative system, although there is poor consultation between the current land-users and the investor, and poor control over the bureaucracy, the administrative systems and their officials.

In some jurisdictions, legal provisions on market-based land valuation are often missing from the legislation; long term benefits for affected land-users and residential community are not secured; and transparent mechanisms to allow the community and social associations to participate in the compulsory land acquisition process are absent. As a result, affected land-users do not always receive adequate compensation for resettlement or support for alternative accommodation, livelihood and employment. Complaints related to levels of compensation and resettlement still account for the majority of all complaints received.

In practice, acquisition of land in use for investment projects can face big challenges:

  1. Provincial leaders prefer economic development as a way to bring their provinces out of poverty and therefore offer more favourable terms to investors and their investment projects, and as a result are less concerned about owners and occupiers whose land is recovered by the government or acquired by the developer with state approval.
  2. Legal provisions are not implemented at local levels or are implemented in ways that ensure more favours for investors; often there are signs of political, bureaucratic or private collusion with investors.
  3. Land prices that are determined by authorized state bodies for computing compensation and resettlement are often much lower than market prices. Thus compensation provided by the government to affected land-users to re-establish themselves is not sufficient.
  4. There is an absence of clearly defined mechanisms and periodical implementation for land inspection by upper level administrative authorities over its lower level authorities; inspection is not undertaken on a regular basis. Violations are not detected and practices are not reformed in a timely manner.
  5. There is a lack of appropriate mechanisms to facilitate the effective participation of people, communities and social organizations in supervising and developing the land legislation, implementing processes by administrative authorities, monitoring the land conversion process, arranging for consensus in benefits sharing between parties involved, and settling disputes involving affected people (Vo, 2009).
Resilience

The concept of resilience provides a useful perspective on sustainable development. At its core is the idea that development processes should not and must not threaten the ability of future generations to share the earth’s resources, as previous generations have been able to. State and regional governments, multi-national corporations, local industry and the individual inhabitants are under increasing pressure to balance economic growth with social responsibility, including good governance, ethical practices, and respect for human rights and traditional cultures. Resilience can be regarded as an operational tool for recognising, improving and measuring corporate sustainability. Resilience is basically about recovering from and adapting to change. It is stressing the importance of achieving effective change for social and economic stability and environmental improvements. There is an inextricable relationship between social wellbeing, economic development and environmental sustainability as shown in Figure 1.


Figure 1: Relationship diagram between social wellbeing, economic development and environmental sustainability (FIG 2008, p. 13).


3. Tools and Land Acquisition

Land acquisition can be practiced and improved in many ways. The main ways can be classified as direct and indirect. Public authorities like municipalities or state authorities may have the main role in both options depending on the legislation and culture. Indirect ways are normally used to encourage and stimulate private developments.

If the public authorities choose to carry out an active direct land policy, they are normally able to acquire land to achieve their development objectives through private agreements with the land owners and users. If these voluntary efforts are not available or successful, they may acquire land in the public interest through the process of compulsory purchase which includes the payment of compensation which normally is intended to equal the economic losses of the land owner.

“Public interest” may be defined to include construction of public roads and parks, provision of services and utilities such as drainage and sewerage, and installation of social facilities like schools and health clinics. In some jurisdictions, it can include housing for open market sale, industrial development and even regeneration projects. The need to implement an adopted land use plan may also be considered to involve public interest.

In most countries local or regional authorities and utility companies are responsible for providing and maintaining local infrastructure including roads, water supply systems, sewage systems, and communication networks. In some cases, however, a private developer may undertake some of these responsibilities as part of implementation of a major project based on a special agreement with the authorities. The costs of these infrastructure facilities are normally paid by the end users through fees calculated according to local rules or prices set by the market place. Major infrastructure facilities, such as highways, airports, ports, bridges, major electricity transmission lines, might be undertaken by state authorities or sometimes contracted out to international companies and infrastructure developers, on a specially negotiated “build, operate and transfer” arrangement.

Land may be acquired and held by public authorities in a land bank in order to control the supply of land for development in the region. These strategic purchases allow a municipality, for example, to control future development by disposing of serviced land in stages. In some jurisdictions, acquired land that is not used for the purpose for which it was originally purchased or is deemed superfluous to requirements within a given time period, must be offered back to the original owner or sold on the open market.

Direct tools

Direct tools for plan implementation can be divided in three main groups: voluntary agreements, compulsory land acquisition and land readjustment procedures. The differences between the procedures used to implement a tool need not be precise. For example, voluntary agreements may be used under the threat of compulsory acquisition if negotiations break down. Voluntary land acquisition may be used by the public or private sector, including private developers. The rules and processes are usually very similar. Compulsory purchase, however, is normally a tool used only by public bodies, although in some jurisdictions the compulsorily acquired land may be transferred directly to the private sector for development.

Figure 2: Four models to adapt the ownership and property structure to changes in land use (Kalbro 1992).

In a normal development project, the land in question is already in the possession of one or more owners and users or is acquired through purchase, expropriation or a similar process (Figure 2, cases 1, 2 and 4). The developer (public or private) will then (usually) produce a development plan (detailed plan) in co-operation with the municipality, obtain the necessary permissions, and implement the project. However, placing an entire development area where fragmented property and ownership structures exist into the possession of one owner or user is both expensive and time-consuming (case
4). Development projects are therefore often difficult to accomplish. For example, even though land may appear well suited for a particular development, this may not be the view of the present owners and users or the surrounding community. Opinions on the nature, course and timing of the development project may differ, as can the willingness of the various land owners and users to participate or take risks. There may even be a lack of resources to implement the project. The development may thus be delayed for a considerable time which generally results in increasing neglect and dereliction of the area as owners see the futility of investing in land and buildings which are destined for demolition. As a consequence, in a number of countries, e.g. Japan, South Korea and Thailand, several types of legal instruments for urban land readjustment have been elaborated in order to ease predictable difficult situations. (Figure 2, case 3).

Compulsory Land Acquisition

Compulsory purchase (expropriation or eminent domain) is an important tool in most of countries for land acquisition for public purposes, although in many countries land acquisition can often be arranged through other means, e.g. by voluntary agreements.

In developing countries, adequate legislation and government capacity can be an initial problem. Countries which give strong constitutional protection to land ownership restrict opportunities for compulsory acquisition, sometimes with fatal results for public projects.

For many countries, e.g. those sharing common law heritage, compulsory acquisition is a familiar method. The overarching ability of governments to take private land for public purposes is generally unquestioned. The opportunity of the government to take land is regulated by legislative processes and familiar standards of acquisition. These standards apply normally to private land but sometimes also to public land held by another authority. Some reasons often mentioned for the use of compulsory purchase include:

  • The monopolistic situation a landowner or user who could stop a development desired by the society by refusing of a voluntary transfer of land or by claiming an unrealistically high compensation.
  • A landowner or user may also, for one reason or another, be missing or be legally incapacitated, as a result of which some sort of compulsory measures are required in any case.
  • The need for efficient land acquisition processes and delivery of the project.

Market systems may encourage the owners’ expectations to be compensated at a value equivalent to commercial or market value as estimated by a professional. Where a free, active, transparent and formally organised land market operates, governments are able to offer market based methods of land delivery that are not available in countries with informal markets. Countries with formalized processes generally experience minimal human and social consequences for land delivery, and use systems of compulsory acquisition which manage the free rider problems associated with opportunities to for land owners and users to refuse to transfer their land in order to get a substantially higher price. Compulsory purchase is not, however, the primary method for land acquisition. For example, the acquiring authority can acquire a poor public image by insisting on a compulsory process. The process however remains available where the land acquisition is not possible in a more socially acceptable way.

The compulsory purchase procedure normally has two phases.

  • An expropriation permit is awarded through an administrative procedure (e.g. by the Council of State, the Ministry of Environment, etc.) and within a legal framework.
  • The compulsory purchase procedure (i.e. the implementation of the powers awarded by the permit), including determination of individual compensations, is executed in expropriation proceedings by a special administrative organ, an expropriation committee, and sometimes the level of compensation is fixed by an appropriate court. For example, in Finland the procedure is carried out by an administrative committee, led by a cadastral surveyor. The ex officio process means that the committee will determine the full compensation even if the land owner will not or cannot apply for it. This means that “full service” is provided to the parties.

The costs of the proceedings are paid by the expropriator. The land or user owner is normally entitled to be compensated for the land acquired, depreciation in the value of any land retained, but also necessary costs, such as moving, travelling, expenses for professional help, and loss of earnings. The decisions on the expropriation can be appealed. It is important that the expropriation and compensation be handled smoothly, swiftly and in a fair and equitable manner. In this way the costs may be reduced and all parties should be satisfied.

Owners and occupiers who are being expropriated or dispossessed generally expect to receive just and full compensation. However, there is no universal principle for expropriation of property. Countries with a common law system recognize that compulsory acquisition does not exist at common law, and therefore, rights to compensation cannot exist at common law. Because compulsory acquisition is a creation of statute, the right to compensation must also exist within statute – these rights cannot be inferred, regardless of the unfairness which results to the land owner or occupier. While it may be socially desirable and generally expected that the land owner’s financial situation remain the same despite the expropriation, non economic losses are not usually compensated. There are normally no strict rules, for example that the owner or user must be able to purchase a similar property for the same price although the popular understanding of compensation may assume this. In reality the concept of “just or full compensation” is entirely dependant on the legislation and its interpretation in each country. The main rule for the assessment of compensation for the property acquired is generally presented as the market value of the land acquired, which normally means a market value calculated from comparable real property transactions. However, this can be defined in a way that prevents the expropriated owner using the compensation to purchase a comparable property in the same or a similar location because the development value created by the acquiring authority (and which is recognized within a market value) is excluded from calculations of the amount of compensation payable.

According to the textbooks, in some jurisdictions, the compensation should cover the objective value (market value) of the expropriated property, the depreciation of the value of any retained property (injurious affection or severance), and other damages (e.g. loss of profits) and costs (e.g. professional fees) which will weaken the financial situation of the expropriated owner or user: TC = (V + S + D) + C, where
TC = total compensation
V = compensation for the expropriated property
S = compensation for damage due to injurious affection or severance
D = compensation for other damages
C = compensation for costs (additional payments).

There are, however, some problems concerning the assessment of compensation. If the make up of the final payment is split in this way, there is no certainty that the land owner or occupier will receive the full compensation. Especially in cases involving a private expropriator, the grounds for calculating the amount of full compensation can be questioned. A certain margin of safety in relation to the amount estimated by conventional valuation methods is often allowed. Some cases may even justify giving a share of the expropriator’s profit to the owner or user. Also a share in a development corporation could in certain cases be an option to allow the land owner to participate in the development and the profit produced.

In practice compulsory acquisition is not a very widely used method. It is often seen as a complex process that takes long time and is expensive both in terms of the cost of the process and the delay in implementing the development, although there are, however, examples of well functioning processes. In addition, interference with private ownership by compulsion is often not considered appropriate, and gives the authority a poor public image in the media. Political decision-makers who favour expropriation often fear a drop in their popularity.

In many countries registration of proprietary rights and usufructs is still rather uncertain. Various permissions are poorly documented or the need for permissions is poorly understood by citizens and investors. For example, within an informal settlement, the compensation would remain totally unpaid if claims are only accepted from registered owners. Practical examples also show that compensation payments may be delayed or may never materialize e.g. due to the expropriator’s lack of capital or corruption of the authorities. People lose their dwellings and even their means of making a living by cultivating parcels of land, without being able to purchase alternative ones. There are also regions where new usable pieces of land are not available, even though the compensation is paid. In these kinds of cases, where there is no supply or even no functioning market, expropriation based on compensation in money seems to be inappropriate and new methods more adaptable to the circumstances are required.

Land Readjustment

The urban land readjustment procedure can be considered either as a method for urban land development (by land owners) or as a tool for planning implementation (by institutions on behalf of the wider society). Different countries have reached different solutions depending on, for example, the planning system already in existence and their attitude towards the responsibilities of the private and the public sectors in producing land for development purposes. In practice, however, the differences are less dramatic than one might think.

A development process in connection with the urban land readjustment procedure does not differ from a “normal” land development process in the main stages, which, according to Kalbro (1992) are: initiation, land acquisition, planning, financing, permission by the authorities, construction of the infrastructure and buildings, and evaluation of the project. Generally speaking, all of these stages can be implemented by the urban land readjustment procedure and a pool of land owners and users (a readjustment association) instead of by an individual developer. At the very least, the readjustment procedure can be regarded simply as a method for changing the division of land. The land is serviced and part of the land (sites) is sold to cover the cost of the project, and the rest is divided between the original land owners and users according to the original land area or value depending on the agreement or the requirements of the jurisdiction. Also a land use agreement can be reached with the public bodies and the development of social housing or other socially beneficial outcomes may be connected to the procedure.

The urban land readjustment procedure is very closely linked to detailed local planning and other land use planning. Normally urban development is based on plans approved following a public consultation process, while the urban land readjustment procedure may be carried out in a number of different ways. At its simplest, the urban land readjustment procedure only implements the existing plan without the processes themselves having any similarities. Planning and the urban land readjustment procedure can even be integrated into one process to obtain synergetic benefits, better participation, cost and time savings, and improved plans. This might, however, produce difficulties in the organisation of the functions and in the co-operation between the various processes.

In practice, the extent of the readjusted areas varies from large – more than one hundred hectares – to small – less than one hectare. The areas to be redeveloped may be “greenfield” (i.e. previously undeveloped) or urban “brownfield” or run down sites. In the readjustment process the parcels of land are notionally assembled in one plot, where the joint owners have a share according to the acreage of the property owned by each or according to the value of the land owned before the procedure began. The site will be shared between the joint owners, so that each of them receives a share of the readjustment area and the real estate boundaries are adjusted according to the detailed plan. Public areas are usually transferred to the municipality, the rights relating to real properties rearranged, any necessary compensations are determined, the infrastructure required for the area may also be implemented, and the financing for its development obtained. The construction of building sites is usually not included in the readjustment procedure or calculations. The costs for the readjustment procedure are covered either by the land owners and users or the municipality, or by all jointly. In order to cover costs, the municipality usually has the right to a share of the profit resulting from the readjustment procedure in the form of parcels of land.

The urban land readjustment procedure is justified not only on the basis of cost and efficiency but also on the basis of its equitable treatment of land owners and users, improvements in the quality of the resulting development, savings to the community, and environmental benefits. Under normal planning conditions the land owners and users may avail themselves of the land value increase or reduction, depending on the intended use according to the plan, i.e. the value of the property may increase considerably or even decrease. In the readjustment procedure the land value changes can be fairly and equally divided between the land owners and users. The procedure will therefore also inhibit speculations about planning. As the existing property boundaries can be ignored when preparing the plan, the variety of potential plan solutions will increase with improvement in the quality of the resulting development. At the same time the existing social structure can also be maintained (in contrast to a situation where expropriation of the area is used). Especially with smaller-scale developments, small entrepreneurs, owners and users are often prepared to invest in the development of their area with little expectation of profit, but only if they feel the original unsatisfactory situation in their area will be improved. The participation of the original land owners and users cannot be directly measured simply in terms of money, however they should have at least some chance of obtaining a share of any future profits.

When cities expand, construction and maintenance costs for the infrastructure increase considerably as do risks of environmental damage. Implementation of the urban land readjustment procedure in areas within the existing urban structure or neighbouring undeveloped or under utilized areas should result in cost savings, reduced pollution and help preservation of the social and natural environment. In addition, as the procedure can also be implemented in areas that would otherwise be difficult to include despite their favourable urban structure and environment, further considerable cost savings can be achieved and environmental damage minimised.

The urban land readjustment procedure is not, however, a trouble-free instrument. The processes needed are often very demanding and complicated and require those involved to display considerable expertise. The decision-makers should also be familiar with the operating mechanisms and options so that implementation of the procedure is not jeopardised by ignorance. Political, administrative and professional conflicts of interest can also come into play, sometimes resulting in an ineffectual adoption of the procedure. However, because of its many positive benefits, the urban land readjustment procedure has already survived for a century, and seems free from threat where its use is common, parties are familiar with the processes and its advantages are well recognised.

Indirect tools

The state or municipality can use many different options to facilitate sustainable development or prohibit unsustainable development.

The indirect tools most closely connected to land development include building prohibition and subdivision prohibition or subdivision permission, pre-emption and financial incentives. Prohibitions as to permissions seek to avoid unwanted buildings or other kinds of land uses in what the authorities see as inappropriate locations. They are commonly used in many developed countries.

Pre-emption rights require the land owners and users in principle to offer their property for sale to the municipality or state first, normally at what may be described as the market value. In some countries, e.g. in Finland, the municipality has a certain period of time to decide to replace the original buyer if it sees that as sensible. These rights can be used in different forms to ensure that the wider public interests can be achieved in particular areas.

Financial incentives may include subsidies to encourage specific developments at a certain location and time. These can include low land prices, property tax abatement over a number of years, low cost development loans, and many other strategies. In some countries, however, the public authorities are not entitled to offer economic incentives. In Denmark for instance, the activities of the public authorities are limited under the general principles of equality and objectivity; and those activities must not intervene in the general conditions of the market or benefit individual persons or companies.

Many other methods, including the popular public-private partnerships, are potentially very useful for implementing larger regeneration schemes e.g. when regenerating old industrial areas, so called brownfield sites, into modern urban sites often with multiple land-uses. These methods include promoting and marketing mechanisms for branding specific developments.


Ho Chi Minh City, Vietnam.


4. Building Capacity in Land Acquisition

Land delivery theory

Land administration systems must be able to manage the delivery of land for essential developments, private sector development and changes of land uses in response to evolving social and economic demands.

Developing countries often lack clearly articulated theories that underpin state power to acquire land, especially if the two basic approaches of civil and common law used in market based economies are inevitably associated with pre-independence colonial experiences. The starting point in these countries lies in framing clear and comprehensive constitutional framework and laws that establish the basis for taking land in situations of unwilling sellers and occupiers, ideally incorporating the human rights standards for resettlement, adequate levels of compensation, and which reflect the needs and expectations of their societies. Often laws along these lines already exist. The problems lie in other directions.

Land delivery processes are cross-cutting

Even from a narrow perspective, land acquisition forms the operative intersection of processes that manage land markets, administer land tenures and implement land use planning. Land acquisition is therefore a complex cross-cutting issue – an issue which is approached in each country, indeed in each local jurisdiction, according to processes drawn from a variety of land administration functions, and often from an historic perspective. In modern land administration theory, the functions of land administration are land tenure, land value, land use and land development which, if the land management paradigm (the method of understanding how the multiple processes work) is applied, are designed to deliver sustainable development (Enemark 2009).

All four functions are involved in land delivery. In countries where all processes are formally organised, land development involves exhaustive and extensive consultation processes related to planning and zoning, and highly professionalized services from government and private sector professionals at every stage. The processes tend to be more transparent and susceptible to public scrutiny than secret.

Developing countries often lack the capacity to build equivalent processes and often rely on non-government organisations (NGOs) for a range of expertise. Their major incapacity however tends to be in technical areas. Creation of new land parcels (subdivision) is often a major stumbling block. Even a very simple project involves the formal identification of land for development purposes, and the subsequent conversion of raw land or the rearrangement of formed parcels into the appropriate development parcels. Whether the market based or human rights models of land delivery are used, adequate and appropriate technical services and administrative capacity must be developed.

Land parcellation

Most land administration systems in developing countries lack the capacity to reorganize land parcels. Parcellation includes the establishment of the boundaries of the development area, coherent arrangements with neighbouring parcels, the identification and agreement of the tenure of the developer, and the provision of infrastructure, including roads, public transport, drainage, electricity, cable services, sewerage, water and so on, at the basic minimum level. These processes of subdivision and consolidation of land are often imperfect, even with the aid of commercial funds and professional project advice. In South East Asian cities, for example Hanoi, existing parcels are frequently small scale, making reconfiguration of land for modern developments difficult, time
consuming and therefore expensive.

The divergence between existing land uses and newly formed parcels is often profound and compounds reconstruction and compensation issues. Discrimination between legal and illegal land development distributes compensation unfairly, and leads to operative paralysis in those developing countries where “legalised” processes for land use planning, development and tenure regulation are not available or not implemented. Determination of “ownership” of land among urban dwellers is often not precise even with a boundary system.

Building land delivery competencies

Within this array of complex issues, three “break through” tools can improve land delivery processes:

  • a quick and effective land information system, a government level tool;
  • a strong and systematically enforced anti-eviction law, an empowerment tool; and guidelines for management of land grabbing,
  • a “win-win” tool for foreign developers, investors and host governments.

These tools are not new. They are supported by their own body of research and experience and they are generally within the competence of most governments. While they are independent of a country’s ability to reach over-all compliance with good governance indicators and land governance indicators, they help comply with them. The tools are presented in more details below.

Land information system – government level initiative

In the vacuum of professional surveying capacity, most developing countries increasingly rely on land information systems (LISs) moving into cadastral surveying as resources become available. A geographic information system (GIS) based LIS is one of the emerging new tools available through new spatial technologies. A systematic tool that relates GIS, remote sensing and field surveying is described by UN-HABITAT (2008). The tool produces a comprehensive but quick and inexpensive information system to support a range of functions, especially land use planning and property taxation. The results do not replace, and indeed cannot replace, cadastral surveying that gives precise parcel mapping, scientific coordination of legal boundaries with plan information, and land use identification. A GIS based LIS, however, offers obvious advantages for managing demographic movement, consultation, and planning processes associated with land delivery and especially compulsory acquisition.

Anti eviction strategies – grass roots empowerment

Countries with inadequate land administration systems and informal markets almost inevitably use forced evictions in land delivery processes. Many evictions, including those based on national legal enforcement orders, ignore the international and constitutional legislation which guarantees the right to housing and other human rights (UN 2007). These follow the definition of minimum security of tenure as the rights of individuals and groups to effective protection by the state against forced evictions (UNHABITAT 2002). The strategic impact of flexible legal formulae, like anti-eviction laws, were further explained by Augustinus and Benschop (2007).

In land acquisition processes, these anti-eviction laws empower local people to claim a role in negotiations related to a development in which they have an interest, especially if the laws provide a clear underlying opportunity for them to complain to courts if they are ignored. The strategy is therefore focused on capacity building at grass-roots level rather than at government administrative levels. Good governance indicators are therefore tested in the general courts system where they are demanded as part of national ability to use a rule of law.

Management of hard cases of land grabbing – an initiative for developers

Land grabbing is a common and negative aspect of land delivery. It causes long lasting tensions, denies individuals of the financial means to relocate themselves and to be economically useful and independent, and undermines civil peace. Criticism of governments in most developing countries for their failures to meet international standards for management of land grabbing seems to be unhelpful.

Governments need help and support in order to establish formal capacity to manage their land delivery systems, for instance along the lines of the recommendations for a code (von Braun and Meizen-Dick 2009). This initiative involves the strategic engagement of foreign investors and their host countries in adopting a self imposed code of conduct for investment in land, and in particular, agricultural land. The code assists target countries to strengthen their policy environment and implementation capacities by combining their efforts with those of investors. The range of terms and conditions suggested in the code delivers “win-win” solutions for all. The issues covered are much wider than mere land administration standards, and include the implementation of good governance standards (transparency) and human rights based standards to protect local people while delivering essential development opportunities.

From the World Bank perspective a large part of the institutional problems associated with the demand for land and natural resources for development is directly related to civil service capacity to effectively address these issues. There are a number of specific, key areas where additional capacity development needs must be focused. These may relate to (Bell, 2009):

  1. Project Screening. How do governments attract appropriate investment interest? How do governments evaluate these initial expressions of interest and then encourage these investors to pursue the development of more formal proposals? How do governments support investors in focusing their proposals that are in the best interests of the country?
  2. Evaluation of proposals. How do governments evaluate land concession proposals? Are they financially sound and is the business plan realistic? Does the proposed investment produce economic benefits for the host country? Is the proposal environmentally sustainable and socially responsible?
  3. Public disclosure. How does government disclose proposed investments to the public, to industry, and to all relevant agencies within government? How do people have an opportunity to raise objections to investments and how are these addressed?
  4. Project monitoring and supervision. How does the government monitor the implementation of the development, including ensuring that the investor complies with the laws, regulations, and safeguards that relate to the investment? How does it ensure that the required reporting takes place and that relevant taxes, concession fees, etc. are paid to the government?
  5. Project documentation. How are records of projects (proposals as well as awarded projects) kept? How are these records accessed, updated, and used for verification and evaluation of project performance?


Hanoi, Vietnam.


5. The Way Forward

The new approaches in land administration encourage civil society, developers and governments to use new tools in land delivery processes. The broadening of land administration theory into multi-disciplinary competence is both welcome and essential. The addition of non-technical goals in building sustainable systems is compatible with the articulation of standards and guidelines on land acquisition.

No developing country is in a position to apply best practice methods throughout its entire suite of land administration processes. However, the lessons from land administration and good governance theories are capable of informing a change of strategies in most countries. Indeed, many of the less developed nations are in a better position to adapt their systems to modern standards than are economically successful nations where the legacy of systems and technologies inhibit substantial change.

Land development is a constant in all nations and the management tools selected by a country need to be developed in the context of its own needs and capacity to contribute to overall good governance and sustainability. Compulsory land acquisition, whether for development aid projects or private projects, needs tools that work at the country and local levels. Unless appropriate tools are selected, land acquisition planning associated with development aid and project financing will concentrate on identifying standards for the social processes associated with movement of people away from the development site and into replacement sites, which will fuel the ever growing problems of informal urban settlements. Guidelines will miss the point that most countries need to build capacity to undertake the scalable and technical land delivery processes. Other tools have unforeseen consequences. A clear and comprehensive legal framework is always recommended; however, legalism and formalism can paralyze land delivery, even for essential public infrastructure projects, a problem now evident in Indonesia.

From the perspective of capacity building in land administration, efforts to define land delivery processes must improve technical capacity to use formal systems to manage the creation of parcels. Reasonably transparent processes and formal systems that facilitate parcel identification, resilient boundaries and use of a large scale base map using modern spatial technology to record coordinates are long term improvements that will assist the removal of residents and occupiers and their resettlement in permanent “formal” homes and alternative and realistic work opportunities.

Each country will develop its own path. Strategic changes are urgently needed to modulate the opportunities of local people, developers and governments in ways that produce long lasting and sustainable results.

For example Dr. Vo recommended a revision of the current Land Law of Vietnam, focusing on the following issues:

  1. Improving the voluntary land conversion measure based on agreements between land-users and investors, in a way that allows more room for the application of this measure. Improvement of this measure is rooted in amendment and supplementation of the legal framework, specifying:
  2. Improving the compulsory land acquisition measure based on administrative decisions by authorized state bodies, in a way that reduces direct influence from the administrative system.
  3. Identifying a reasonable limit for applying compulsory or voluntary measures which are based on the principle that the compulsory acquisition of land will only be applied to development projects for national and public interests, national defence and security, and for economic development projects that serve national and public purposes.

Furthermore he recommended improvement of land policies to ensure the efficiency of their practical implementation and to target both economic development and social sustainability. Other specific recommendations include policies with regard to voluntary benefits sharing, promotion of the participation of communities and social organizations, strengthened opportunities for dialogue between the government and the people, creation of real consensus in relation to investment projects across all parties, and enhancement of inspection and evaluation works by upper level administrative authorities over their lower level ones.

Good governance

Good governance is fundamental to achieving the benefits of the protection of formal property rights and informal land uses that deliver livelihoods for millions of people. The development of efficient and effective land and property markets, social development and economic prosperity also depend on good governance, as does efficient and effective stewardship of the environment and natural resources. Governments with a record of transparency, accountability, stability and responsiveness are far more likely to attract investment, provide high-quality public services and manage resources more cost-effectively than those whose activities are opaque and not open to public scrutiny. Corruption may breed where government officials have discretion without accountability, especially in government agencies involved in provision of services to the public including land.

Good governance in land administration is not a new issue, and is as important in the developing world as it is in developed countries. Efficient, effective, transparent and accountable land administration services are as much about the administration of land as they are about the public service and institutions that operates within any country. Typically, reform of land administration in any country is a long-term prospect requiring decades of sustained commitment. It involves a major investment of capital and human resources and requires strong and consistent leadership in order to achieve effective, sustainable outcomes. In post-conflict countries, tenure security and access to land are major factors in providing the long-term stability that supports the development of transparent land markets capable of generating durable results.


Hanoi, Vietnam.


References and Bibliography

As mentioned in the foreword this document is based on the presentations at the 7th FIG Regional Conference, 19–22 October 2009, Hanoi, Vietnam, especially the keynote presentations. Conference proceedings are available on-line at www.fig.net/pub/vietnam

Further references and bibliography are:

  • Augustinus, C., Benschop, M. (2007): Security of tenure – Best Practices, UN-HABITAT, Nairobi, Kenya.
  • Bell, K.: (2009): Trends in Land Administration and Management with Particular Reference to World Bank Support for Projects in the East Asia Region. FIG Article of the Month, November 2009.
    http://www.fig.net/pub/monthly_articles/november_2009/november_2009_bell.html
  • Enemark, S: (2009): Facing the Global Agenda – Focus on Land Governance. FIG Article of the Month, July 2009. http://www.fig.net/pub/monthly_articles/july_2009/july_2009_enemark.html
  • FAO (2008): Compulsory Acquisition of Land and Compensation. FAO Land Tenure Studies No 10. Rome. http://www.fao.org/docrep/011/i0506e/i0506e00.htm
  • FIG (2008): Costa Rica Declaration, Pro-Poor Coastal Zone Management. FIG Publication No 43.
    http://www.fig.net/pub/figpub/pub43/figpub43.htm
  • Kalbro, T. (1992): Markexploatering. Ekonomi, juridik, teknik och organisation. LMVrapport
    1992:4. Lantmäteriverket. Gävle. 288 s. ISBN 91-7774-033-5.
  • UN (2007): Basic Principles and Guidelines on Development-Based Evictions and Displacement http://daccess-dds-ny.un.org/doc/UNDOC/GEN/G07/106/28/PDF/G0710628.pdf?OpenElement
  • UN-HABITAT (2002): Expert Group Meeting on Urban Indicators, Nairobi, Kenya.
  • UN-HABITAT (2008): Systematic Land Information and management: technical Manual for Establishing and Implementation of a Municipal Geographic Information System, Nairobi, Kenya.
  • Viitanen, K. (1996): Influence in Land Use Planning and in Urban Land Readjustment. Royal Institute of Technology, Real Estate and Construction Management, Real Estate Planning and Land Law, Publication 4:76. Stockholm. 44 p. ISSN 0348-9469. (In Swedish)
  • Viitanen, K. (2000): The Finnish Urban Land Readjustment Procedure in an International Context. Royal Institute of Technology, Real Estate and Construction Management, Real Estate Planning and Land Law, Publication 4:84. Stockholm. 397 p. ISSN 0348-9469. (In Swedish)
  • Viitanen, K., Kakulu, I. (2008): Global Concerns in Compulsory Purchase and Compensation Processes, FIG Working Week Stockholm 14–19.6.2008; FIG Article of the month, February 2009. http://www.fig.net/pub/monthly_articles/february_2009/february_2009_viitanen
    _kakulu.html
  • Vo, D. H. (2009): Improving Land Acquisition and Voluntary Land Conversion in Vietnam. Policy Note, The World Bank. Ha Noi, June 2009. 69 p.
  • von Braun, J., Meizen-Dick, R. (2009): “Land Grabbing” by Foreign Investors in Developing Countries: Risks and Opportunities, International Food Policy Research Institute (IFPRI), Policy Brief 13. http://www.landcoalition.org/pdf/ifpri_land_grabbing_apr_09.pdf
  • Wallace, J. (2009): Land Acquisition in Developing Economies. 7th FIG Regional Conference, 19–22 October 2009, Hanoi, Vietnam; FIG Article of the Month, February 2010. http://www.fig.net/pub/monthly_articles/february_2010/february_2010_wallace.html
  • Williamson, Enemark, Wallace, Rajabifard (2010): Land Administration for Sustainable Development. ESRI Press Academic.


Hanoi, Vietnam.


Published in English
Copenhagen, Denmark
ISBN 978-87-90907-82-2

Published by
The International Federation of Surveyors (FIG)
Kalvebod Brygge 31–33, DK-1780 Copenhagen V
DENMARK
Tel. +45 38 86 10 81
E-mail: FIG@FIG.net
www.fig.net

February 2010

ACKNOWLEDGEMENTS
Editor: Stig Enemark
Cover photos: Front cover: Hanoi, Vietnam (left), Central Vietnam (middle) and
Ho Chi Minh City, Vietnam (right) © Stig Enemark
All photographs: © FIG
Design and layout: International Federation of Surveyors, FIG
Printer: Oriveden Kirjapaino, Finland


FIG PUBLICATION No 51

Hanoi Declaration
Land Acquisition in Emerging Economies

Published in English

Published by The International Federation of Surveyors (FIG), February 2010
Copenhagen, Denmark
ISBN: 978-87-90907-82-2

Printed copies can be ordered from:
FIG Office, Kalvebod Brygge 31-33, DK-1780 Copenhagen V, DENMARK,
Tel: + 45 38 86 10 81, E-mail: FIG@fig.net